New Triple Garage with an Office Started

New Triple Garage with an office above coming along nicely. All insulated below DPC and up to first lift.

The 50 mm rigid insulation board was taped as required, the fire break was also installed.

The perimeter has also been stoned up to keep the site clean. All ready for the brickies to start on the natural stone.